How shall the following types of contract cost linked to the estimated value of project works? And what are their pros and cons?
1. A fixed percentage with estimated value of works
2. A fixed amount of cost with or without ceiling
3. A fixed portion plus a variable portion that would tie to the estimated value of the works or works duration